Project: wcooper   -  
            Listing for Category : Air Conditioning
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:William Cooper   -  
Project:   Vans - RV-10   -   VIEW REPORTS
Total Hours:29.5
Total Flight Time:
Total Expense:$175687.69
Start/Last Date:Jan 29, 2019 - No Finish Date
Engine:Lycoming YIO-540-D4A5 RT(Y)
Propeller:Hartzell C2YR-1BFP/F8068D
Panel:Garmin
 
Friendly URL: https://eaabuilderslog.org?s=wcooper

Home or Last Project Picture

May 16, 2022     A/C Continuted...       Category: Air Conditioning
Riveted the drain into place today. Used the CS4-4 pulled rivets that were supplied with the SFSA kit. I counter sunk the skin side of the drain and dimpled the fuselage skin to accept the flush rivets. Also riveted the top end of the F-1028 BAGGAGE BULKHEAD CHANNEL to the F-1006D FUSELAGE BULKHEAD. This is because a hose from the A/C will be routed through a lightening hole on the F-1028 Bulkhead Channel. I'm going to have to think about the bottom rivets on the channel piece. I may need some help... Then I trimmed the Tunnel Hose Templates to get ready to drill the holes for the A/C Hoses.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.